← DOOMRADAR

infrastructure · Published brief

Solar plant planned to supply much of Delhi–Meerut rail corridor

A planned 110 MW solar plant costing Rs 450 crore is expected to meet nearly 60% of the Delhi–Meerut corridor’s electricity needs and cut power costs by 25%.

By DoomRadar · Published on DoomRadar .

Why it matters

The project could reduce operating costs and improve energy resilience for a major rail corridor.

Related source links

These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.

  1. India's first 160 kmph Namo Bharat train service, also the fastest, began in 2023; now a Rs 450 crore, 110 MW solar plant will meet nearly 60% of Delhi-Meerut corridor's power needs and cut electricity costs 25% ↗timesofindia.indiatimes.com · Recorded source date: Sep 1, 2026, 6:16 AM UTC

AI-assisted, source-based analysis. Methodology · Report a correction