Metro viaduct design flaw could require reconstruction and cause major public-funds loss
A design lapse on Metro 7A may force the reconstruction of a viaduct stretch, potentially costing Rs 260 crore in public funds.
By DoomRadar · Published on DoomRadar .
Why it matters
Reconstruction could delay transport infrastructure and impose a substantial cost on public finances.
Related source links
These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.
- Metro 7A design lapse may force MMRDA to rebuild viaduct stretch, could lead to Rs 260cr public funds loss ↗timesofindia.indiatimes.com · Recorded source date: Aug 27, 2026, 5:16 AM UTC
AI-assisted, source-based analysis. Methodology · Report a correction