Data centre power demand forecast to rise sevenfold over the next decade
AEMO predicts that electricity use by data centres will increase sevenfold over the next decade.
By DoomRadar · Published on DoomRadar .
Why it matters
The projected demand could materially pressure electricity generation, transmission capacity and grid planning.
Related source links
These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.
- AEMO predicts seven-fold rise in data centre power use over next decade ↗itnews.com.au · Recorded source date: Aug 24, 2026, 11:01 PM UTC
- Asia Pacific data centre values set to top USD $950bn ↗itbrief.co.nz · Recorded source date: Aug 25, 2026, 8:32 AM UTC
- India's data centre capacity hits new high as AI powers a 4x boom ↗economictimes.indiatimes.com · Recorded source date: Aug 25, 2026, 9:31 AM UTC
AI-assisted, source-based analysis. Methodology · Report a correction