← DOOMRADAR

infrastructure · Published brief

PJM plan identifies gas pipelines as a power-supply bottleneck

PJM’s five-year planning outlook reportedly favors gas generation while identifying pipeline capacity as a constraint.

By DoomRadar · Published on DoomRadar .

Why it matters

Fuel-delivery bottlenecks could limit electricity reliability across parts of the eastern United States.

Related source links

These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.

  1. PJM's 5-Year Plan: Gas Wins, Pipelines Named as Bottleneck - Marcellus Drilling News ↗marcellusdrilling.com · Recorded source date: Aug 24, 2026, 4:01 PM UTC

AI-assisted, source-based analysis. Methodology · Report a correction