← DOOMRADAR

travel · Published brief

Mumbai airport to partially demolish Terminal 1

Mumbai International Airport plans to begin partial demolition of Terminal 1 on January 15. The work may affect airport operations and passenger flows.

By DoomRadar · Published on DoomRadar .

Why it matters

Terminal works could cause flight, access and passenger-distribution disruptions.

Related source links

These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.

  1. MIAL to begin partial demolition of Mumbai airport's T1 from January 15 ↗business-standard.com · Recorded source date: Aug 24, 2026, 3:47 PM UTC
  2. Mumbai airport overhaul: T1 partial razing from Jan 15; flight shifts planned ↗rediff.com · Recorded source date: Aug 24, 2026, 5:47 PM UTC

AI-assisted, source-based analysis. Methodology · Report a correction