← DOOMRADAR

infrastructure · Published brief

Scheduled power interruptions to affect NAIA Terminal 1

NAIA Terminal 1 in the Philippines is scheduled to experience power interruptions from August 24 to 26.

By DoomRadar · Published on DoomRadar .

Why it matters

The outages could disrupt airport terminal operations and passenger services.

Related source links

These links were collected with this event. Recorded source dates may reflect when a link was found. Article publication dates are shown only when available from the source. Open the originals for their full context.

  1. NAIA Terminal 1 to experience power interruptions from August 24 to 26 ↗philstar.com · Recorded source date: Aug 23, 2026, 9:46 AM UTC

AI-assisted, source-based analysis. Methodology · Report a correction